There are no planned events
There are no system restrictions at this moment .
- Restriction: 6,000,000 kWh/h
- Reason: Unexpected Plant SD Duration still unknown
Electrical problems power surply.
- Restriction: 6000000 kWh/hr
- Reason: Unexpected shut in of the pipeline, due to big power failure.
The shut down will last until 16:00 assuming all goes well we have enough throughput to start up the plant again.
After this the capacity of NOGAT will still be restricted on account of required maintenance of the L2 riser. It is still expected that the maintenance on the L2 riser will be completed on Sunday in the evening at earliest.
- Restriction: 6000000 kWh/hour
- Reason: Complete Nogat Shut down due to big power failure.
Duration unknown
- Restriction: Full Shut Down 4.200.000
- Reason: The current indication is the NOGAT plant will be operational from 18:00 assuming there are not setbacks in the start up process.
- Restriction: 10,000,000 kWh/h
- Reason: Yearly maintenance Nogat Plant
- Restriction: 8,000,000 kWh/hour
- Reason: Planned Summer Shut Down 2016 Extended
- Restriction: 35000000
- Reason: Unplanned gas train shut down
- Restriction: 5483673
- Reason: Unplanned SD of plant, start-up is 17:00hr
- Restriction: 3,000,000
- Reason: One of the production units has unexpectedly shut down.
- Restriction: 3700000
- Reason: Safety related issue
Restriced flow starts 21:00 02-12-2017
end of restriction is expected to be 23:15 3-12-2016
- Restriction: 5500000
- Reason: Planned annual shut down NOGAT pipeline between 22th August 07:00 hr till 23th August 07:00 hr
There will be no production between these hours
- Restriction: 2,300,000 kwh
-
- Restriction: 5,000,000
- Reason: Planned Annual Shutdown
- Restriction: 1650000
- Reason: Nogat SD
Minimum flow restriction
Not enough production for the plant to be running.
- Restriction: 5,000,000
- Reason: Due to It problems Plant sd
- Restriction: 1.750.000
- Reason: Planned: Nogat Shutdown due to pigging activities.
- Restriction: 4000000
- Reason: Plant shutdown due to leakage fuelgas system, all shippers to 0. start at 12-02-2019 01:00 hr.
Start-up expected 13-02-2019 09:00.